References
newlynn

Some Projects in Short Description

RHI/VDR Veitsch Radex Urmitz GmbH

Urmitz works

germany 

Bickley hood kiln
High temperature refractories (1180°C, 1530°C and 1700°C)

Burner plant replacement; Installation

of 20 HV burners (capacity 25 kW each), divided into 3 seperately controllable burner groups; Installation of MIC system.

Optimization of temperature distribution
Reduction of fuel consumption
by 25%
Reduction of maintenance
and repair

ABC-Klinker Hollager Ziegelwerk Berentelg & Hebrok GmbH


Hollage works

germany 

Franke Tunnel kiln
Clinker bricks, Pavers

Pre-firing zone: 6 HV burner plants
(each equipped with 7 burners);
Main firing zone: 7 impulse injector burner plants (9 burners each); cooling zone optimization, integration of flashing system, installation of MIC system, visualization via PLC-PC control system.

Plant Optimization Stage 1:

Output increase of 30%

Quality improvement to
95% First Class

 

CB Feuerfest GmbH


Trabach works

austria 

Burwitz tunnel kiln
Insulating firebricks

Complete thermotechnical outfit with kiln internal heat recirculation from cooling zone to pre heat zone, flue gas chimney (height 28m), separate  hot gas generator for the drying tunnel, kiln control integrated in central process in process control system

New development of
production plants

Wienerberger
(formerly thebrickbusiness)

Eldon works

britain

Keller tunnel kiln
Facing bricks

Installation of 2 HV burner groups with 12 burners each in the pre-firing zone, Installation of MIC system




Extension of pre-firing zone with 12 HV burners; Implementation of 4 burner groups with 21 impulse injector burners each, operated on MIC system

Plant Optimization Stage 1:

Output increase of 50%
to 24 cars per day
Quality improvement
to 98% First Class

 

Reduction of HF emission by 85%

Plant Optimization Stage 2:

Output increase by further 30%

Carlton Brick

Brick Manufactures

Grimethorp

britain
 

Brisesco tunnel kiln
Facing bricks

Installation of a cross-flow injection system, separately adjustable groups of 66 HV burners (side firing) kiln doors, rapid cooling and final cooling. Operated on MIC system using PC/PLC visualization.

Quality improvement
to 98% First Class

Lagan Building Group


Kingscourt works

ireland 

Morando tunnel kiln
Facing bricks

Installation of 6 HV burner groups of 7 

burners each and 7 burner groups of 7 burners each, automated reduction / flashing across 4 groups (natural / liquid gas combined), pulse cooling system, automated hot air extraction, renovation of flue gas and sliding air systems, renewal of kiln control system with visualization and installation of MIC system.

Output increase by 20%
Quality improvement
to 98% First Class

Monier Brickmakers
CSR Building Products (NZ) Ltd.


New Lynn works

new_zealand 

Keller tunnel kiln
Facing bricks,
Paving bricks

Pre-heater and tunnel kiln renovation; Renovation of pre heat zone with 56 HV burners HV BG3, Renovation of firing zone with 112 injector burners. Installation of MIC system; renovation of hot air extraction, flue gas system and piping system; fully automated kiln and pre-heater control system with visualization, car tracking, and product dependant process control.

Output increase by 50%

Quality improvement
to 99% First Class

Reduction of energy consumption

Reduction of maintenance
and repair

 

COROBRIK


Phesantekraal works

south_africa 

Walter tunnel kiln
Facing bricks

Installation of a heavy furnace oil fueled burner plant. 10 burner groups with 190 burners LB BG0 S, top firing installation. Conversion of cooling zone with addition to capacity, extension of tunnel dryer including installation of additional recirculation and air extraction units.

Output increase by 30%

Quality improvement

Reduction of energy consumption

Reduction of maintenance
and repair

 

SBK
Sloboschanska Budivelna Keramika


Kharkiv works

ukraine

Tunnel kiln
(sovjet type)

Facing bricks

Installation of HV burner groups, replacement of flue gas system, extension of hot air extraction systems.

Increase of annual production from 30 mil. to 42 mil. bricks

Quality improvement to 95% First Class, Reduction of specific energy consumption

 

Boral Bricks, Inc.


Van Wyck, SC

united_states 

Keller tunnel kiln
Facing bricks

Replacement of 42 Keller impulse burners with HTBS impulse injector burners.

Optimization of oxygen supply and carbon fumigation, reduction of black core oxidation

                 …and many more






















































Further Clients:

germany Ziegelwerk Müller, Neuschoo 
germany Ziegelwerk Waldsassen AG 
germany AKA Ziegelwerke GmbH & Co KG, Peine Works
germany AKA Ziegelwerke GmbH & Co KG, Algermissen Works
germany Ziegelwerk Englert, Zeilitzheim 
germany Ziegelwerk Bellenberg 
germany Ziegelwerk Hüning 
germany Röben Tonbaustoffe GmbH, Bannberscheid Works
germany Röben Tonbaustoffe GmbH, Reetz Works
germany Wiekor – Gruppe, Riesa Works 
germany Ziegelwerk Icking 
germany JUWÖ Porotonwerke 
germany Lafarge, Schiedel Wiesau 
germany Lafarge, Buchen Works
germany Majolika, Heidelberg 
germany Wächtersbach Keramik, Brachttal 
germany CERIC Thermic WISTRA 
germany Keramischer Ofenbau GmbH 
germany Dr. Fürer Ingenieurleistungen 
germany Ingenieurbüro Rittmann 
britain Ibstock Building Products Ltd., Stourbridge Works 
britain Ibstock Building Products Ltd., Ashdown Works
britain Ibstock Building Products Ltd., Ravenhead Works
britain Ibstock Building Products Ltd., South Holmwood Works
britain Ibstock Building Products Ltd., Pinhoe Works
britain Ibstock Building Products Ltd., Aldridge Works
britain Ibstock Building Products Ltd., Chesterton Works
britain Ibstock Building Products Ltd., Throckley Works
britain Thebrickbusiness (now Wienerberger), Todhills Works 
britain Thebrickbusiness (now Wienerberger), Steerpoint Works
britain Thebrickbusiness (now Wienerberger), Eldon Works 
denmark Gørding Klinker
denmark Wewers Teglværker AS (now Wienerberger)
denmark Skamol A/S, Fur 
australia Boral Brick, Thomastown Works
australia Boral Brick, Albury Works
australia Boral Brick, Badgery Works
australia Boral Roofing, Wyee Works
australia CSR / PGH Brick and Pavers, Maitland Works
australia CSR / PGH Brick and Pavers, Cecil Park Works
australia CSR / PGH Brick and Pavers, Golden Grove Works
australia CSR / PGH Brick and Pavers, Schofield Works
australia Selkirk Brick PTY LTD, Ballarat Works
australia Austral Brick 
czec_republic Ziegelwerk Hevlin 
czec_republic Ziegelwerk Libochovice 
czec_republic Ziegelwerk Dolní Cerekev 
italy VELA s.p.a., Corte Franca Works
belgium Hanson Desimpel, Kortemark Works
belgium Heylen Brick 
united_states Boral Brick, Van Wyck Works
united_states ACME Brick, Oklahoma Works
united_states ACME Brick, Tulsa Works
south_africa COROBRIK, Springs Works
south_africa COROBRIK, Phesantekraal Works
south_africa COROBRIK, Riedvlei Works
south_africa ESTON Brick and Tile 
netherlands Instalat B.V. 
austria Wienerberger, Laa upon Thaya Works
austria CB Feuerfest GmbH 
switzerland AG Ziegelwerke Horw, Werk Gettnau 
switzerland HF Absorb AG, Stein 
switzerland ZZ Wankor 
saudi_arabia Alhamrani Co. For Industry, Asfahan 1 Works
saudi_arabia Alhamrani Co. For Industry, Asfahan 2 Works
ireland Kingscourt Brick 
ireland Ormonde Brick 
morocco Societe Briqueterie Bati Chaouia 
lithuania Ziegelwerk Akiju Sabjebrida 
france Pousseur Refractaires, Liverdun Works
france Imerys, Tuillerie de l´Aubois

… and many more